Boston-Logan International Runway 27 Documents
Airports - New England Region
MITRE-CAASD - BOS Runway 27 Ongoing Compliance Reporting (September 2008) (PDF) (Updated 9/11/2008)
MITRE-CAASD - BOS Runway 27 Ongoing Compliance Reporting (May 2008) (PDF)- Massport - RWY 27 Radar Analysis (September 2008)
-
A - with numbers and percentages of tracks through each gate (PDF)
B - with percentages of departures inside and outside the corridor (PDF)- AC Meeting Agenda (September 23, 2008) (PDF)
- Draft AC Meeting Notes (November 14, 2007) (PDF)
- U.S. Terminal Procedures for Boston Departures (Updated 5/9/2007)
Runway 27 Analysis, November 2007 (PDF)
Boston Logan International Airport, Runway 27 Flight Track Analysis (PDF)
BOS Runway 27 Ongoing Compliance Reporting (September 2007) (PDF)- U.S. Terminal Procedures for Boston Departures (Updated 5/9/2007)
- Airport Diagram - Logan International (BOS) (PDF)
Boston Runway 27 Noise Abatement Departure Procedure Special Notice (PDF)- Logan Four Departure and the WYLYY Six Departure
- Boston Logan Airport Noise Study
- Record of Decision for Runway 27 (August 30, 1996) (PDF)
- Analysis of Jet Departures from Boston-Logan Runway 27 (July 2006) (PDF)
- Presentation to the Boston Logan Runway 27 Advisory Committee (AC) (September 27, 2006) (PDF)
- AC Meeting Minutes (September 27, 2006) (PDF)
- AC Meeting Agenda (September 27, 2006) (PDF) (Updated 5/9/2007)
- AC Meeting Minutes (September 29, 2005) (PDF)
- AC Meeting Rules (PDF)
- AC List of Members and Interested Parties (PDF) (Updated 5/13/2008)
- Update of Runway 27 Activities (February 21, 2007) (PDF)
- Draft AC Meeting Minutes (March 30, 2007) (PDF)
- AC Meeting Agenda (March 30, 2007) (PDF)
- Runway 27 Track Data from Massport (PDF)
- Runway 27 Usage Charts (September 2006 through February 2007) (PDF)
- Runway 27 Update (March 30, 2007)
- Runway 27 Update (Complete) (PDF, 10.74 MB)
- Runway 27 Update (Part 1) (PDF, 2 MB)
- Runway 27 Update (Part 2) (PDF, 1.85 MB)
- Runway 27 Update (Part 3) (PDF, 1.88 MB)
- Runway 27 Update (Part 4) (PDF, 2.09 MB)
- Runway 27 Update (Part 5) (PDF, 1.85 MB)
- Runway 27 Update (Part 6) (PDF, 1.32 MB)
Because of the size of this file, we have provided it as both a "complete" file and in six parts for easier downloading.
* The next Runway 27 AC meeting is scheduled for September 23, 2008, from 6:00 p.m. - 9:00 p.m. at the Volpe Transportation System Center in Cambridge, MA.
